全國知名互聯(lián)網(wǎng)會展平臺,提供展會設(shè)計、展覽設(shè)計搭建、會展策劃、會展搭建等全方位解決方案!
  • 展會
  • 展館
  • 國內(nèi)展會
  • 國際展會

立即搜索

立即搜索
  • 國內(nèi)展館
  • 國際展館

立即搜索

立即搜索
  • 全球展覽館
  • 1/1

智利安托法加斯塔Atacama Desert

場館地址: Ilustre Municipalidad de Antofagasta Avenida Séptimo de Línea 3505

主要目的: 展覽,會議

場館介紹: After constant monitoring and coordination with the various institutions of the Emergency Committee, the Red Alert rose by bad weather front for the Region of Antofagasta. Since the beginning of precipitation, about 2:00 am, the Municipality deployed its team addresses Emergencies and Operations, Public Safety and Community Development Directorate, closely following the situation in the towns and avenues the city. In this regard, Mayor Karen Red delivered a report indicating that "from 2:30 am constitute the Community COE which allowed us to be in different parts of the city until this hour, in short we believe that in general all it is within normal limits. We have no victims to mourn or victims. The main damage that we are public spaces, especially in the southern part of the city, so we hope the report that we will submit to the ONEMI, have the resources and the important support of the Regional Government to recover quickly Antofagasta different points. "   So far no victims or people in shelters in the 5 qualified establishments throughout the city as part of the contingency plan are reported. The Dideco has worked with 150 neighborhood associations in the district to determine involvement and has distributed 2,000 plastic in one hundred percent of the neighborhood units affected. The Emergency Management and Operations works with motor pump for normalization of the Parque Los Pinares sector, one of the most affected by water accumulation. According to the report of the Community Planning Secretariat, the appearance of a sinkhole is recorded in the Coviefi sector, Avenida Mar del Plata, against which the type of civil work is evaluated to be performed as a final solution. In coordination with Aguas Antofagasta, working to normalize the flooded areas of the city and the power company is conducting the respective repairs in areas where power outages occurred, especially in public lighting. After constant monitoring and coordination with the various institutions of the Emergency Committee, the Red Alert rose by bad weather front for the Region of Antofagasta. Since the beginning of precipitation, about 2:00 am, the Municipality deployed its team addresses Emergencies and Operations, Public Safety and Community Development Directorate, closely following the situation in the towns and avenues the city. In this regard, Mayor Karen Red delivered a report indicating that "from 2:30 am constitute the Community COE which allowed us to be in different parts of the city until this hour, in short we believe that in general all it is within normal limits. We have no victims to mourn or victims. The main damage that we are public spaces, especially in the southern part of the city, so we hope the report that we will submit to the ONEMI, have the resources and the important support of the Regional Government to recover quickly Antofagasta different points. "   So far no victims or people in shelters in the 5 qualified establishments throughout the city as part of the contingency plan are reported. The Dideco has worked with 150 neighborhood associations in the district to determine involvement and has distributed 2,000 plastic in one hundred percent of the neighborhood units affected. The Emergency Management and Operations works with motor pump for normalization of the Parque Los Pinares sector, one of the most affected by water accumulation. According to the report of the Community Planning Secretariat, the appearance of a sinkhole is recorded in the Coviefi sector, Avenida Mar del Plata, against which the type of civil work is evaluated to be performed as a final solution. In coordination with Aguas Antofagasta, working to normalize the flooded areas of the city and the power company is conducting the respective repairs in areas where power outages occurred, especially in public lighting.

當(dāng)前第1/1首頁1尾頁
萬元

5 . 4

1 3 4

  • 國內(nèi)
  • 國外

m2

m2

獲取報價

本價格為低配估算價格,實際搭建報價
以展覽公司設(shè)計圖為準(zhǔn)。

因場館不同,本價格不含電箱、管理費(fèi)
、垃圾清運(yùn)和押金等現(xiàn)場費(fèi)用,如有需 求可代繳。

稍后搭建管家將致電您,為您提供免費(fèi)
搭建咨詢服務(wù)。

查看詳情
  • 免費(fèi)設(shè)計
  • 免費(fèi)報價

10秒登記,免費(fèi)獲取專業(yè)設(shè)計方案

手機(jī)
  • 手機(jī)
  • 固話

獲取更靠譜方案,拒絕超預(yù)算

手機(jī)
  • 手機(jī)
  • 固話

我已閱讀并接受 《會展城服務(wù)說明》

風(fēng)投A輪投資5000萬,搭建就上會展城

更專業(yè)的搭建服務(wù)平臺,百萬參展商的共同選擇

常見問題

  • 1、如何注冊賬戶?

    1)點擊會展城首頁右上角頂部【注冊】,進(jìn)入注冊頁面... [更多]

  • 2、無法登錄/忘記密碼怎么辦?

    1)點擊會展城右上角頂部【登錄】,進(jìn)入找回密碼界面... [更多]

  • 3、如何修改賬戶信息?

    1)登錄會展城,進(jìn)入【會員中心】... [更多]

  • 4、如何郵箱認(rèn)證,手機(jī)認(rèn)證?

    1)點擊會展城首頁右上角頂部【注冊】,進(jìn)入注冊頁面... [更多]